The original Urbanistic-architectural concept of the area and the complex design solution was provided by the architectural studio Atrium, s.r.o. from Košice, the holder of many major awards for design and architecture and one of the largest processors of zoning plans in Slovakia.
Description: Logistics and trading complex
Entrance: from the south-west by tertiary road
Status: S2A: sold | S2B: built
in the north: wildlife corridor Balka stream (is to be preserved and developed)
in the east: Nová Polhora municipality
in the south: roundabout and road 3325
in the west: football field
Description: building complex consists of 2 logistics buildings
Construction of the buildings: multi-nave and multi-modal
Material used: steel and reinforced concrete
September 2019 – entire sector S2 was sold to P3 Žilina s.r.o.
January 2020 - the first logistics hall with the size of 12 800 m2 passed the final inspection.
April/May 2020 – the construction of the second logistics hall with the size of 12 800 m2 begins.
Description: Commercial service complex, containing warehouses, commercial, service and administrative offices and the required transport and green areas
Entrance: from collector road
Status: Development opportunity
majority of green areas is designed within the area of Starina water line.
the Starina water line is undergoing the western area of the sector
sector is between the road 3325 and collector road
in the north: motorway interchange with Nová Polhora motorway feeder
in the south: land drainage system
Description: main building is to form a single unit
Construction of the buildings: multi-nave and multi-modal
Material used: steel and reinforced concrete
Description: Logistics complex containing warehouses, administrative offices and the required transport and green areas
Entrance: 2 main entrances from the collector road
Status: Reserved
majority of green areas is designed in front of the alley facade
in the north: road 3325 and the roundabout
in the east: Nová Polhora municipality (separated by insulating green area)
in the west: collector road
Description: main building is to form a single unit
Construction of the buildings: multi-nave and multi-modal
Material used: steel and reinforced concrete
The sector S4 is reserved for P3 Žilina s.r.o. until the end of December 2020.
Description: Logistics complex containing warehouse, administrative offices and the required transport and green areas
Entrance: main entrances from the service road
Status: Reserved
majority of green areas is designed to be on the eastern and northern edges of the sector
underground power line of high voltage and trafostation are planned in the northern edge
in the north: sector S4
in the east: Nová Polhora municipality (separated by insulating green area)
in the south: service road
in the west: WWTP
Description: consists of 2 buildings
Construction of the buildings: multi-nave and multi-modal
Material used: steel and reinforced concrete
The sector S5 is reserved for P3 Žilina s.r.o. until the end of December 2020.
Description: Logistics complex comprising warehouses, administrative offices and the required transport and green areas
this sector (36 500 m2) is divided into 7 separate lands (of approx. 5000 m2) that are to be sold separately for private construction
Entrance: main entrance from the service road
Status: 1 sold | 5 Development opportunity
majority of green areas is designed to be on the eastern and western edges of the sector
in the north: service road
in the east: service road
in the south: sector S7
in the west: collector road
First land of 4474 m2 was sold to the company, for the construction of roadworthiness testing centre for trucks, buses and passenger cars.
Description: Logistics and production complex comprising warehouses, production halls, administrative offices and the required transport and green areas
Entrance: main entrance from the collector road
Status: S7A: Development opportunity | S7B: Development opportunity
majority of green areas is designed to be on the eastern and western edges of the sector
in the north: sector S6
in the east: road 3325
in the south: collector road
in the west: collector road
Description: building complex consists of 2 buildings
Construction of the buildings: multi-nave and multi-modal
Material used: steel and reinforced concrete