Infrastructure and network engineering

Infrastructure and network engineering

Gas in the municipality is supplied from the Ploské regulator station. There are future plans for the medium-pressure gas line construction in Bretejovce which, for the purpose of the Nová Polhora Logistics and Industrial Park will be connected to the high pressure pipe line.
Just before completion, there is the water piping in the village as a part of a group water piping and the park will be connected to this group piping in stages. Long-distance water piping Starina-Košice runs along the border of the park.
We are planning to construct a group canalization system including the sewage water treatment on the place of a former manor. The sewage water treatment is designed right next to it. Rain water drains into the terrain and the drainage conducts the rain water from the roads into the discharge channels. The above ground electric lines of extra-high voltage 400 kV and high voltage 22 kV run through the park. The park will be connected to the telecommunication network. Opto cables will be used in order to realize connection and distributors.

Write to us

Write to us any question.
Like we to answer. Write

Write to us

any question. Like we to answer.